Primary package
Confirm filled container, closure, coding and any unit-level presentation requirements.
Coordinate secondary packing, pallet protection, loading calculations, shipping marks and export documents around the confirmed product and route. Packing quantities and container plans are recalculated for each approved configuration rather than copied from another SKU.
Primary packaging, case configuration, dividers or trays, pallet dimensions, protection, labels and container use are connected decisions. Changing one component may change weight, stability, handling or loading calculations.
The approved packout should identify the exact SKU and package version. Final quantities are based on confirmed dimensions, weight, pallet plan, container limits and route requirements.
Confirm filled container, closure, coding and any unit-level presentation requirements.
Define case, tray, divider, film or carrier configuration for the SKU.
Review pallet, layer arrangement, height, protection, wrapping and labels.
Calculate loading from confirmed pack dimensions, weight and route constraints.
Approve case and pallet marks before final packing.
Align packing, commercial and shipment records with agreed responsibilities.
Case count, pallet layers, gross weight and loading quantity should never be borrowed from a visually similar product. Confirmed can or bottle format, packout, material thickness, pallet and route limitations determine the final plan.
| Review area | What to verify |
|---|---|
| Product & package | SKU, container, closure, unit count and approved presentation |
| Case configuration | Case style, dimensions, dividers or trays, weight and marks |
| Pallet requirement | Pallet type, footprint, stack pattern, height and protection |
| Loading inputs | Container type, internal limits, total weight and handling constraints |
| Trade & route | Incoterm, origin, destination, port and booking responsibility |
| Document set | Packing list, commercial documents and project-agreed certificates |
Freeze unit, case and pallet configuration.
Release case, pallet and destination labels.
Use confirmed dimensions and weights.
Align timing and responsibilities with the trade term.
Complete loading and retain agreed records.
Prepare the confirmed shipment document set.
It is calculated from confirmed unit, case and pallet dimensions, weights, container limitations, stacking rules and route requirements. It should not be copied from another product.
Buyer pallet, height, protection or labeling requirements can be submitted for review. Feasibility and cost depend on the product, packout, route and destination.
Preferred trade terms should be stated in the RFQ. The applicable term, named place, responsibility split and quotation basis must be confirmed for the order.
The agreed commercial, packing and shipment documents can be coordinated for the confirmed transaction. Destination-specific requirements should be supplied early.
No. Production readiness, booking availability, carrier schedules, port conditions, customs and route changes can affect timing. Use the confirmed shipment plan rather than a generic duration.
Use the connected capability pages to verify development, manufacturing, quality, facility, document and export requirements before order release.
Capability, facility, certification, testing, quantity, schedule and document availability are confirmed for each approved project.
Send the product, package, order quantity, case and pallet requirements, destination, trade term, target timing, marks and required documents.